Carbon fiber prepreg storage: tracking cumulative out-time
A practical record guide from receipt through cutting and lay-up, separating storage expiry from time outside controlled storage.

Storage life is not working time
Hexcel’s HexPly guide distinguishes shelf life, tack life and cumulative out life before cure. Do not transfer one product’s temperature or time limits to another resin system or HUAMEI material.
Keep the history with the material
Link each incoming lot to its data-sheet revision. Record removal, return, cutting, lay-up and cure times; carry the history onto remaining material. For frozen products, follow the manufacturer’s sealed warm-up instructions before opening to control condensation.
Variable checklist
| Variable | Check and record |
|---|---|
| Lot and expiry | Check label, receipt date and whether expiry starts at manufacture or receipt |
| Temperature excursion | Record time, temperature and packaging; segregate pending disposition |
| Out-time | Record each interval and cumulative history |
| Remaining material | Retain original lot, repacking time, quantity and history |
| Handling | Do not judge acceptance from tack alone; compare with product criteria |
Prepare for an enquiry
Provide material code, resin system, width, areal weight, intended lay-up date, storage equipment, transport history and sample size. Enquire about specifications and quotations after confirming the product.
Related product · Prepare for an enquirySources and scope
This is a proposed record workflow, not HUAMEI shelf-life test data. Manage PU composite prepreg (CSFCM), PUSMC and epoxy carbon fiber prepreg under their separate product instructions.