Lightweight design review
Assess component mass together with required stiffness and strength for handling and assembly.

HUAMEI / FLOATING SOLAR & AQUACULTURE
Explore materials and components for floating and offshore solar, aquaculture cages and walkways. Review PU composite prepreg composition, fabrication and verification requirements.

APPLICATION CONCEPTS
Explore cage layouts, working decks and floating solar maintenance access.

Review floats, frames, nets and walkway layout together.

Check wet-surface slip resistance, drainage and fastener inspection.

Separate module supports from walking routes and review buoyancy and mooring conditions.
Application concept · not a photograph of an installed or supplied project.
01 / MATERIAL
CSFCM combines a polyurethane (PU) resin matrix with woven glass fabric, chopped glass fibers and additives. The pre-impregnated material is cut, positioned and molded into a component.
The catalog describes sheet material and customization of width, thickness and areal weight. Confirm supply dimensions, packaging, storage and usable life against the current product documentation.
PU is the resin system; glass fiber is the reinforcement. Carbon fiber prepreg, SMC and PUSMC are separate products with their own processing and performance requirements.
PU composition & specifications →
Cut and place the material, heat and press in the mold, cure and demold. Review the geometry and production method of each float or frame separately.
Concept animation only. Confirm temperature, pressure and time for the selected product and tooling.
02 / MOLDING
This overview follows the catalog’s cutting, layup and compression-molding description. Fiber orientation, charge quantity and mold geometry affect the process; verify temperature, pressure and curing time through molding trials.
Check grade and storage history
Review shape and fiber orientation
Check charge position and quantity
Validate product-specific conditions
Review dimensions and fixing features
Check appearance, dimensions and requirements
DESIGN ADVANTAGES
These design considerations follow the material and components shown in the PDF. Quantified advantages and service life require product-specific validation.
Assess component mass together with required stiffness and strength for handling and assembly.
Review float, support-frame and connection-clip geometry and interfaces separately.
Use absorption, salt-spray and temperature/humidity data to plan further checks for the site.
Discuss inspection access, drainage, fastener checks and replaceable components.
03 / COMPONENTS
The marine project document presents PU floats, support frames and connection clips. Confirm the exact material grade, manufacturing method and supply scope for each drawing.

A component of a floating structure. Review buoyancy, sealing and fixing points.

Connects the float and upper structure. Review spans, load paths and joints.

Connects assembly components. Review fastening force, cyclic loading and metal contact.
Component photographs from marine project PDF p.30
04 / PROJECT REFERENCES

An application photograph in the PDF’s development-project section. Site identity, delivery scope and current status require confirmation.

A farm layout photograph from the PDF, showing how floats and walkways connect.
Marine project PDF pp.31–33 · Development/application references
OFFSHORE SOLAR
The marine PDF introduces offshore solar platforms as an application area. Review the modules, support structure, floats and connection/mooring system separately to define materials and supply scope.
Review panel layout, support spacing and load paths.
Review buoyancy, watertightness and frame/clip connections.
Discuss site waves, wind, water levels, inspection routes and access to electrical equipment.

Source caption: yellow HDPE floats and a white pultruded FRP frame. This is not evidence of PU product supply.
A platform reference photograph in the PDF. It does not establish that the entire platform or all components are made from PU or CSFCM.
The platform photograph is an application reference. It does not establish that the whole installation uses PU or that HUAMEI supplies or installs the generating system. Maintenance walkways require separate design and testing.
DEVELOPMENT / PDF p.31
Geometry concept based on supplied material · not original CAD.
1 Central · 2 Eccentric · 3 Corner
| Load position | Maximum deformation | Maximum stress |
|---|---|---|
| Centre | 23.099 mm | 129.7 MPa |
| Eccentric | 20.319 mm | 86.567 MPa |
| Corner | 7.3533 mm | 97.756 MPa |
Model dimensions · 2600 × 720 × 714 mm
Model mass · ≈ 24.36 kg
No additional top load: approx. 23.8 mm. With approx. 100 kg added: approx. 121.3 mm.
Development model and analysis values from PDF p.31. Load magnitude, supports and safety factors are not confirmed; these are not allowable finished-part loads. The position diagram is schematic, not an analysis contour plot.
Open the source PDF (Chinese) · p.31 ↗05 / VERIFICATION
Material coupon data alone cannot establish a finished walkway’s allowable load. Verify the component together with its supports, thickness and fastening arrangement.
Point loads, support spans and long-term creep
Wave/work loads and joint fatigue
Wet slip resistance and drainage
Property changes after saltwater, moisture and UV exposure
Fastening force and corrosion at metal interfaces
Cleaning access and replaceable sections
The following is a topic summary of PDF p.13, not individual test certificates. Confirm specimen layup, direction, thickness, laboratory and acceptance criteria in the original reports.
| Item | Reported in the PDF | Application check |
|---|---|---|
| Tension and bending | Tensile strength 364 MPa / flexural strength 572 MPa | Distinguish specimen layup, direction and thickness from finished-part loading |
| Water absorption | 0.03% / GB/T 1462 Method 1 | Confirm exposure conditions and retained properties |
| Heat and humidity | 85±3°C / 82–88% RH / 1,000 hours | Summary reports 11 items compliant; obtain item-level results |
| Thermal shock | −40 to 85°C / 500 cycles / 1,000 hours | Summary reports 11 items compliant; verify the actual test method |
| Salt spray | GB/T 2423.18 / 672 hours | Summary reports 7 items compliant; not an immersion or lifetime rating |
Values and conditions are transcribed as reference data. Verify the cited standard editions and their applicability. They do not establish certification, field life or an allowable walkway load.
06 / PROJECT CONSULTATION
Discuss raw-material supply, molding trials, tooling, custom components and required tests separately. Manufacturing and supply scope are agreed after reviewing drawings and project conditions.
Drawings · Dimensions · Quantity · Support spans · Loads · Environment · Fixings · Delivery date
Sources: HUAMEI product catalog pp.4–6; marine project document (2026.07) pp.13, 23, 30–33. Confirm project participation, current status and detailed test conditions during consultation.
Ask us about products, quotes, samples or joint development projects.